MANUFACTURING OF NATURAL POWER HIGH ENERGY DRINK HALTED

MISA_logo_zambia
INTERNET SHUTDOWN IN DRC SOURCE OF WORRY
January 7, 2019
ECZ 2
ECZ DISPELS ASSERTIONS THAT IT IS COMPROMISED
January 9, 2019

MANUFACTURING OF NATURAL POWER HIGH ENERGY DRINK HALTED

ZABS-ON-SHOPRITE

 

Revin Zambia limited, the manufactures of natural power high energy drink based in Ndola has been directed to stop the production and distribution of the energy drink.

 

This follows social media reports from Uganda that the energy drink may contain a substance which is used for the treatment of erectile dysfunction in men.

 

In a joint statement, the Zambia medicines and regulatory authority, Ndola city council and the Zambia Bureau of standards say investigations have been instituted on the matter. download (7) 

 

The three institutions have since urged the public to stop consuming the drink until conclusive results are released to either confirm or dismiss the allegations.

 

Leave a Reply

Your email address will not be published. Required fields are marked *